Missed Collabro’s Legare Free Webcast Series?

Written on . By CPM Solutions

If you missed Collabro’s free webcast series on Legare, then you’re in luck. You can still watch Legare presentations on Collabro’s website.

The free webcasts were on a series of topics that included:

  • Cost (Budget) Loading into Primavera P6
  • XER Fixer – Loading XER Files into P6
  • SAP: Smooth, Accurate, and Practical Integration between SAP and P6

Watch the videos here.