Q&A: “How can I tell what version of Primavera P5/P6 is installed?”
Written on . By CPM Solutions
Primavera P5 / P6 Project Management Client version and Database version information can be found by logging into the Primavera Project Management Client Application.
Follow these steps:
- Click on Help, About Primavera.
- Click on the System tab. The second line displays the client application version information.
- Scroll down to the Components section. The second line under the heading “Components” displays the database versionORI\DB: PMDB,0500.0024.0001.0006 is Service Pack 3
ORI\DB: PMDB,0500.0024.0001.0005 is Service Pack 2
ORI\DB: PMDB,0500.0024.0001.0004 is Service Pack 1
ORI\DB: PMDB,0500.0024.0001.0002 is the Base Version
ORI\DB: PMDB,0500.0016.0001.0001 is the 5.0 Beta Version