
Accommodations
Burnaby/Vancouver, B.C. Accommodations.
Four hotels within a short distance from our Burnaby/Vancouver training venues:
Accent Inns
3777 Henning Drive, Burnaby, B.C., V5C 6N5
Phone: (604) 473-5000 | Fax: (604) 473-7599
Reservations: 1 (800) 663-0298 | Book a reservation online
Distance from our office: 7 km
Shuttle available, 3-4 blocks from Brentwood Mall and Skytrain station
View on Map
Delta Burnaby Hotel and Conference Centre (& Grand Villa Casino)
4331 Dominion Street, Burnaby, B.C., V5G 1C7
Phone: (604) 453-0750 | Book a reservation online
View on Map
Executive Inn
4201 Lougheed Highway, Burnaby, B.C., V5C 3Y6
Phone: (604) 298-2010 | Fax: (604) 298-1123
Reservations: 1 (800) 590-3932 | Book a reservation online
Distance from our office: 5.5 km
1 Block from Brentwood Mall and Skytrain station
View on Map
Hilton Vancouver Metrotown
6083 McKay Avenue, Burnaby, B.C., V5H 2W7
Phone: (604) 438-1200 | Fax: (604) 431-7782
Reservations: 1 (800) 445-8667 | Book a reservation online
Distance from our office: 4.8 km
Includes continental breakfast, local calls, Internet access, newspaper
At Metrotown Mall and Skytrain station
View on Map
Holiday Inn Express Metrotown
4405 Central Boulevard, Burnaby, B.C., V5H 4M3
Phone: (604) 438-1881 | Fax: (604) 438-1883
Reservations: 1 (877) 323-1177 | Book a reservation online
Distance from our office: 4.8 km
Includes continental breakfast, local calls, Internet access, newspaper
At Metrotown Mall and Skytrain station
View on Map
Edmonton, A.B. Accommodations.
The following hotels are located within a short distance from our Edmonton training venue:
Four Points by Sheraton Edmonton South
7230 Argyll Rd NW, Edmonton, A.B., T6C 4AC
Phone: (780) 465-7931
View on Map
Best Western Cedar Park Inn
5116 Gateway Boulevard, Edmonton, A.B., T6H 2H4
Phone: (780) 434-7411
View on Map
Delta Edmonton South Hotel
4404 Gateway Boulevard NW, Edmonton, A.B., T6H 5C2
Phone: (780) 434-6415 | Book a reservation online
View on Map
Radisson Hotel Edmonton South
4440 Gateway Boulevard NW, Edmonton, A.B., T6H 5C2
Phone: (780) 437-6010
View on Map
Calgary, A.B. Accommodations.
The following hotels are located within a short distance from our Calgary training venue:
Holiday Inn Express Hotel Suites
1020 8th Avenue SW, Calgary, A.B., T2P 1J2
Phone: (403) 269-8262
View on Map
Sandman Hotel Calgary City Centre
888 7 Avenue SW, Calgary, A.B. T2P 3J3
Phone: (403) 237-8626
View on Map
The Coast Plaza Hotel & Conference Centre
1316 33rd Street NE, Calgary, A.B., T2A 6B6
Phone: (403) 248-8888
View on Map
Ramada Hotel Downtown Calgary
708 8 Ave SW, Calgary, AB T2P 1H2
Phone: (403) 263-7600
View on Map