Virtual Training

If you are on a tight schedule and need training sooner than one of our scheduled in-class training courses, then P6 Consulting can deliver courses in a virtual environment. Students can be located anywhere in the world and simply need access to audio (computer or phone) and the internet to take part in our fully interactive, live ‘one-on-one’ training.

In our virtual classroom, you get direct, comprehensive training from Primavera® experts using seamless over-the-web connectivity. You will receive the same content delivered in P6 Consulting’s traditional “brick and mortar” classrooms. Similar to our traditional classroom setting, P6 Consulting’s virtual classroom stresses the same hands-on learning, providing each registered student with exclusive access to live Primavera® systems throughout each course.

Benefits of Virtual Classroom Training

  • Eliminate travel costs, wasted time, and hassle by training from a convenient location (home, office, etc.)
  • Access to a live instructor for the complete duration of the course
  • Course materials will either be available for download or shipped direct to your door
  • Use your own PC for the duration of the class
  • Download and install the trial version of Oracle® Primavera® P6 on your computer to practice the case studies on your own

How Does the Virtual Training Work?

A P6 Consulting instructor will lead the class using collaboration software so that each student can view the instructors screen and vice versa. Working together through the course, the instructor can share any application on their desktop, including slideshows, documents, and Primavera® P6. Students can also easily share their screen with the instructor and the entire class for questions and troubleshooting as well.

All students are responsible connecting into the live meeting on time as the course will be conducted the same hours and duration that classroom courses are set at. Instructors take the students through the lessons exactly as-if it was a live classroom. At the end of each day of training, students can practice the extra case studies on their own computers for more hands-on experience using the program.

What You’ll Need to Take a Virtual Course

The technical requirements to participate in a virtual classroom delivery are basic and require little to no cost to implement. The following is a summary of the major requirements:

  • Ability of registered student to download meeting applications, plug-ins, etc… required for participation in virtual classroom delivery
  • Computer (laptop, desktop, PC)
  • High-speed Internet access (LAN, DSL, cable)
  • Larger monitor (recommended)
  • Internet Explorer browser
  • Phone or computer with headset/microphone/speakerphone feature
  • Download and install the trial version of Oracle® Primavera® P6 on your computer. Instructions will be provided after registration of the course.

Get More Information

To learn more about P6 Consulting’s virtual training capabilities, please contact our head office to discuss needs and course customization.